This Table provides the fees for survey of land for buildings. For the purpose of land survey, building lands are classified as follows:
-
land for residential purposes, e.g. for dwelling houses, flats, apartments and open space for recreation;
-
land for commercial purposes, e.g. mixed development for commercial and residential purposes, shophouses, cinemas, complexes, hotels, hostels, petrol stations, offices and profit motivated developments;
-
land for industrial purposes, e.g. mixed development for industries and others, factories, plants, workshop, mills, printing presses, foundries, electrical substations, pumphouses, sewerage treatment plants, and oxidation ponds.
-
Land for other purposes, which are not classified under paragraph 1, shall be regulated by Table VII
- The survey fee chargeable under this Table for each job shall consist of the following charges and are applicable to urban, suburban and rural areas. These survey fees shall also apply to the re-survey for the re-establishment of boundary marks for any type of land classified under paragraph 1 -
- basic charge per job - RM 1,000.00;
- charge for the preparation of pre-computation plan shall be RM 20.00 per lot, subject to a minimum charge of RM350.00 per job;
- charge for the survey for the re-establishment of old boundary marks found missing or out of position is RM 170.00 for each mark refixed or replaced;
- charge for survey per lot -
| Size of Lot |
Residential purpose per lot
(RM) |
Commercial purpose per lot
(RM) |
Industrial purpose per lot
(RM) |
| (i) residential and commercial purpose: |
| Up to 100 square metres |
250.00
|
400.00
|
-
|
| Above 100 square metres but up to 200 square meters |
370.00
|
430.00
|
-
|
| For each additional 100 square meters or part thereof above the first 200 square metres |
10.00
|
12.00
|
-
|
| (ii) industries purpose: |
| Up to 2,000 square metres |
-
|
-
|
900.00
|
| For each additional 100 square meters or part thereof above the first 2,000 square metres |
-
|
-
|
15.00
|
| (iii) |
| charge for survey of azimuth, connections and controls |
2.00 per meter
|
2.50 per meter
|
2.50 per meter
|
| (iv) |
| charge for survey to determine the ends of a party wall boundary |
150.00 per wall
|
180.00 per wall
|
200.00 per wall
|
| (v) |
| charge for survey of block pegging of corners of blocks not exceeding 16 lots |
840.00 per block
|
1,000.00 per block
|
1,200.00 per block
|
| (vi) |
| charge for survey of pegging each lot with wooden pegs |
65% of the above applicable rates
|
65% of the above applicable rates
|
65% of the above applicable rates
|
| (vii) |
| charge for verification survey and certification of the "as-built" |
80% of the above applicable rates plus certification charge of RM1,500.00
|
80% of the above applicable rates plus certification charge of RM1,500.00
|
80% of the above applicable rates plus certification charge of RM1,500.00
|
e. where the survey data is required to be submitted in digital format, an additional charge of 20% of the charges under paragraphs (b), (c) and (d) above is applicable; and
f. professional consultation and meeting fees, reimbursements and charge for supply of transparencies and additional prints, where applicable, are as provided under Table XII, Table XIII and Table XIV respectively.
|